CASES

Case Studies

Actual installations and application records

25 case studies

Installation Configurations
Case Studies

Installation Configurations

Installation arrangements and product configurations preserved in YHB catalogues.

Case Studies

MUC-60VR Installation at a Chicken Restaurant in Jeongneung

An archived MUC-60VR installation at a chicken restaurant in Jeongneung.

MUC-90VR Installation at a Coffee-Roasting Factory in Goyang
Case Studies

MUC-90VR Installation at a Coffee-Roasting Factory in Goyang

An archived MUC-90VR installation at a coffee-roasting facility in Goyang.

MUC-90FR · MUC-60FR Installation at a Grill Restaurant in Ansan
Case Studies

MUC-90FR · MUC-60FR Installation at a Grill Restaurant in Ansan

An archived MUC-90FR · MUC-60FR installation at a direct-fired grill restaurant in Ansan.

MUC-120FR Installation at a Duck-Grill Restaurant in Changwon
Case Studies

MUC-120FR Installation at a Duck-Grill Restaurant in Changwon

An archived MUC-120FR installation at a duck-grill restaurant in Changwon.

Case Studies

Jungnang-gu Restaurant Installation — Seoul Odour-Control Support, 2021

An archived lamb-skewer restaurant installation in Jungnang-gu under the 2021 Seoul support programme.

Case Studies

Daerim-dong Restaurant Installation — Seoul Odour-Control Support, 2021

An archived restaurant installation in Daerim-dong under the 2021 Seoul odour-control support programme.

Case Studies

Yeongdeungpo Restaurant Installation — Seoul Odour-Control Support, 2021

An archived charcoal-grill restaurant installation in Yeongdeungpo-gu under the 2021 Seoul support programme.

YMC-350 AF Installation at a Machining Facility in Siheung
Case Studies

YMC-350 AF Installation at a Machining Facility in Siheung

An archived YMC-350 AF installation at a machining facility in Siheung.

YMC-400 Installation at a Metalworking Factory in Yeonsu-gu, Incheon
Case Studies

YMC-400 Installation at a Metalworking Factory in Yeonsu-gu, Incheon

An archived YMC-400 installation at a metalworking facility in Yeonsu-gu, Incheon.

YMC-300C Installation at a Metalworking Factory in Pyeongtaek
Case Studies

YMC-300C Installation at a Metalworking Factory in Pyeongtaek

An archived YMC-300C installation at a metalworking facility in Pyeongtaek.

YMC-400F · A/F Installation at a Metalworking Factory in Hwaseong
Case Studies

YMC-400F · A/F Installation at a Metalworking Factory in Hwaseong

An archived YMC-400F · A/F installation at a metalworking facility in Hwaseong.

Case Studies

Magok-dong Restaurant Installation — Seoul Odour-Control Support, 2021

An archived chicken-restaurant installation in Magok-dong under the 2021 Seoul support programme.

Gwangjin Roastery · YEC-30
Case Studies

Gwangjin Roastery · YEC-30

Roasting exhaust collection for a Buja 1.5 kg roaster.

Songdo Grill Restaurant · MUC-60FR
Case Studies

Songdo Grill Restaurant · MUC-60FR

A ceiling installation arranged around inspection and maintenance access.

Siheung Metalworking Plant · YMC-350 / 400
Case Studies

Siheung Metalworking Plant · YMC-350 / 400

Eight YMC-350 and six YMC-400 units for CNC lathes and machining centres.

Case Studies

MUC-60VR Installation at a Burger Restaurant in Siheung

Cooking exhaust collection for burger grilling and frying.

Yeoksam Duck Restaurant · MUC-120FR
Case Studies

Yeoksam Duck Restaurant · MUC-120FR

A rooftop installation arranged for the exhaust duct and maintenance access.

Osan Metalworking Site · YOC-350
Case Studies

Osan Metalworking Site · YOC-350

A wall-mounted oil mist collector arranged for the available workshop space.

Jungnang Lamb Skewer Restaurant · MUC-60V
Case Studies

Jungnang Lamb Skewer Restaurant · MUC-60V

An electrostatic collector arranged around the existing exhaust fan and rooftop space.

Pyeongtaek Metalworking Plant · Four YMC-300C Units
Case Studies

Pyeongtaek Metalworking Plant · Four YMC-300C Units

Washable C-type collectors installed above CNC lathes and machining centres.

Pyeongtaek Metalworking Plant · YMC-350 / A/F
Case Studies

Pyeongtaek Metalworking Plant · YMC-350 / A/F

Four YMC-350 units with after filters for CNC lathes and machining centres.

Pyeongtaek Food Factory · MUC-180FR
Case Studies

Pyeongtaek Food Factory · MUC-180FR

Two MUC-180FR collectors installed for a food factory expansion.

Hwaseong Metalworking Plant · YMC-350 / A/F
Case Studies

Hwaseong Metalworking Plant · YMC-350 / A/F

Ten YMC-350 collectors with after filters installed for machining.

Hwaseong Machining Plant · YMC-400
Case Studies

Hwaseong Machining Plant · YMC-400

Two YMC-400 collectors installed above machining centres.